Guadua house construction in Guayaquil
NAVIGATION introduccion localizacion diseño insolacion materiales cimentacion paredes elementos tipos de paneles construccion de paneles montaje union entre paneles acople de paneles forrado de paneles cubierta - estructura techo recubrimiento de morteros proceso [Index] «back next»

3.2.7. Panel Lining

The laminating of the panels was carried out once all the structural elements were fastened to each other, forming a solid group.

The chopped cane was placed horizontally with the glossy face toward the interior of the panel, and fixing it to each stud by means of 1 1/2" nails that were joined with galvanized wire #18, allowing spacing between the slits for mortar penetration.

NAVIGATION introduccion localizacion diseño insolacion materiales cimentacion paredes elementos tipos de paneles construccion de paneles montaje union entre paneles acople de paneles forrado de paneles cubierta - estructura techo recubrimiento de morteros proceso [Index] «back next»
   

Project: "Guadua house construction in Guayaquil", National Simposium Bambú – Guadúa
Douglas Dreher
Portoviejo, Nov, 1991.
Go back to: Projects Douglas Dreher Architects


Douglas Dreher Architects - Arquitectura, Diseño y Urbanismo • email: info@douglasdreher.comtelefax: 593 4 2382529
dirección: Ilanes y 2º- Edificio 2 Of. B Planta baja, Ciudadela Urdesa Central, Guayaquil -Ecuador

Copyright © 2004 • Guayaquil-EcuadorDouglas Dreher Arquitectos • douglasdreher.com
diseño web Clickderecho.com - Diseño web centrado en usuarios

 

DouglasDreher.com