Guadua house construction in Guayaquil
NAVIGATION introduccion localizacion diseño insolacion materiales cimentacion paredes elementos tipos de paneles construccion de paneles montaje union entre paneles acople de paneles forrado de paneles cubierta - estructura techo recubrimiento de morteros proceso [Index] «back next»

3.2.6. Adjusting Panels to the traditional constructive system

The structure and masonry walls of bathrooms were lifted simultaneously with the wooden panels.

In the vertical structural elements, 6 mm wire rods were set to be fastened to the stud of the adjacent panel.

Once the structure was fixed to the foundation, the panels were plumbed, to place the roof rafters, which were fixed to the panels’ top headers, being then joined to the foundation and the roof structure.


NAVIGATION introduccion localizacion diseño insolacion materiales cimentacion paredes elementos tipos de paneles construccion de paneles montaje union entre paneles acople de paneles forrado de paneles cubierta - estructura techo recubrimiento de morteros proceso [Index] «back next»
   

Project: "Guadua house construction in Guayaquil", National Simposium Bambú – Guadúa
Douglas Dreher
Portoviejo, Nov, 1991.
Go back to: Projects Douglas Dreher Architects


Douglas Dreher Architects - Arquitectura, Diseño y Urbanismo • email: info@douglasdreher.comtelefax: 593 4 2382529
dirección: Ilanes y 2º- Edificio 2 Of. B Planta baja, Ciudadela Urdesa Central, Guayaquil -Ecuador

Copyright © 2004 • Guayaquil-EcuadorDouglas Dreher Arquitectos • douglasdreher.com
diseño web Clickderecho.com - Diseño web centrado en usuarios

 

DouglasDreher.com