3.4.1. Process

»» Before applying the mortar, the panels were moist two hours in advance.


»» The first layer was applied, beginning on the interior panels, leaving a very rustic texture with the purpose of having good adherence for the following layer.


»» To this first layer an 8-day cure time was given; during this period, it was moisturized twice a day, using hoses.


»» Later, the second layer of coarse plaster with flat texture was applied, leaving expansion joints every two meters. This layer was treated for 5 days.


NAVIGATION introduccion localizacion diseño insolacion materiales cimentacion paredes elementos tipos de paneles construccion de paneles montaje union entre paneles acople de paneles forrado de paneles cubierta - estructura techo recubrimiento de morteros proceso [Index] «back next»
   

Project: "Guadua house construction in Guayaquil", National Simposium Bambú – Guadúa
Douglas Dreher
Portoviejo, Nov, 1991.
Go back to: Projects Douglas Dreher Architects


Douglas Dreher Architects - Arquitectura, Diseño y Urbanismo • email: info@douglasdreher.comtelefax: 593 4 2382529
dirección: Ilanes y 2º- Edificio 2 Of. B Planta baja, Ciudadela Urdesa Central, Guayaquil -Ecuador

Copyright © 2004 • Guayaquil-EcuadorDouglas Dreher Arquitectos • douglasdreher.com
diseño web Clickderecho.com - Diseño web centrado en usuarios

 

DouglasDreher.com