Technical Record

Malecon 2000 Project; Civic Square (Mid Sector)
Malecon 2000 Foundation

General Manager: Dr. Pedro Gomez-Centurion
Project Director: Mr. Guillermo Suaya
Technical Manager: Roberto Espíndola, Engineer

Authors

Urban-architectural consultant: Oxford Brookes University / UK; Architect Tito Fernandez Davila, Architect Noé Carvajal
Design Team Chief: Douglas Dreher A., Architect
Urban Furniture Design: Luz Marina Salgado, Designer
Design Development: Manuel Contreras, Architect; Sergio Alvarado, Architect; Edison Ochoa, Architect;. Antonella Rossi, Architect

Collaborators

Landscape Design: Cecilia Von Buchwald, Landscaper
Sanitary Design: Feliciano Gonzales, Engineer
Electric Design: José Hill, Engineer
Structural Design: Carlos Chon, Engineer
Fountains Hydraulic Design: Pablo Donoso, Engineer
Metal mechanics Consultant: Carlos Ordonez, Engineer

Surface

24,503.61 m2

Date of Project

1998-1999

Inauguration date

October 9 de1999

Project Cost

US $17'000,000.00

Pictures

Carlos Rodríguez S., Photographer